House services: decisions before plastering

Changing finished walls is costly and disruptive. Agree service routes, equipment and access before they are concealed.

Reading time · 2–3 minutes

Start with furniture and equipment

The kitchen, beds, desks, televisions and fitted furniture determine many connection points. Put sockets, switches, lighting, water, drainage and climate equipment on a coordinated plan. Check actual product dimensions and installation space.

Avoid clashes between systems

Drainage needs space and suitable levels; ventilation needs duct routes; air conditioning needs refrigerant lines and condensate drainage. Electrical circuits and protection must match the actual loads. Coordinate penetrations through structural elements with the structural design before making them.

Design for maintenance

Keep valves, filters, manifolds, electrical panels and serviceable units accessible. An access panel must allow work, not merely a view inside. Allow for removing covers, replacing consumables and taking out equipment without damaging finishes.

Accept concealed work before covering it

  • Tests of systems and connections against the design and equipment instructions.
  • Labelling of circuits, equipment and valves.
  • Measured photographic records, diagrams and owner instructions.

Ready to estimate the cost of your project?

Be your own site manager ↗Talk to MONTELOFT →

Cookie preferences

Allow Google Analytics cookies for visit and enquiry statistics? Ad personalization is disabled. Forms work without analytics.

Privacy

Swipe to change photo. Pinch to zoom. Drag to pan when zoomed in.

Background concept · AI visualization